Scheduled maintenance after 'nth' work item

trishtrish
Created at
in Community support

Hello,
I'm trying to simulate a 3D printing line. So far I've manged to simulate everything bar one thing, resin replenishment. The resin cartridge needs to be swapped out after 7 work items have been completed. I figured I could use the efficiency tab on the activity but it only allows an average time between breakdowns.
Is there a way to properly simulate this?