Head (before)

Resource Requirements for Desired Output? — SIMUL8 Community Forum

Head (after)

Ask the SIMUL8 Community

Content (before)

Resource Requirements for Desired Output?

N_SowardsN_Sowards
Created at
in Community support

Is it possible to tell SIMUL8 that I need XX amount units completed in a month and then have SIMUL8 tell me the number of resources that would be necessary to achieve that goal? I know OpQuest can optimize an objective function by manipulating the decision variables, but is it possible to set the value that I am looking to achieve?



Comments

  • Was this answer helpful?


    1

    Hi there, I recommend adding the number of units completed to your KPIs (i.e. the result which counts this such as End Point : Work Completed or Activity: Work Completed) , and indeed use OptQuest, but in your Constraints, to set the units completed at a minimum value e.g. End 1: Work Completed<=500

    Does this help?

    Luis

Leave a Comment

BoldItalicStrikethroughOrdered listUnordered list
Emoji
Attach file
Attach image
Align leftAlign centerAlign rightToggle HTML viewToggle full pageToggle lights
Drop image/file

Content (after)